Kirchliche Solarstrom Beteiligungsgesellschaft OKR

Location: Stuttgart

Evangelischer Oberkirchenrat, 60,6 kWp, commissioning 2004

Partner: Evangelische Landeskirche Württemberg

Legal Society: Kirchliche Solarstrom Beteiligungsgesellschaft mbH & Co. KG

Limited partners: 38

Special feature: first destruction of a PV plant afer 18 years due to demolition of the building

Kreisgymnasium Bad Krozingen KBK

Location: Bad Krozingen

Kreisgymnasium, 66 kWp, commissioning 2004

Partner: Landratsamt Breisgau-Hochschwarzwald

Legal Society: Solarstrom Beteiligungsgesellschaft mbH & Co. KG Kreisgymnasium Bad Krozingen

Limited partners: 31

Special feature: mounted on roof with low inclination due to structural strength; later a 2nd plant was added at the other roof

Stuttgarter Schulen

Locations: Stuttgart

– Anne-Frank-Realschule, 57 kWp,  commissioning 2005

– Grund- und Hauptschule Plieningen, 80 kWp,  commissioning 2005

– Elly-Heuss-Knapp-Gymnasium, 73 kWp,  commissioning 2005

– Rilke Realschule, 44 kWp,  commissioning 2005

– Königin-Charlotte-Gymnasium, 55 kWp, commissioning 2006

Legal Society: city of Stuttgart

Gesellschaft: Ecovision Solarfonds GmbH&Co. KG Stuttgarter Schulen

Limited partners: 78

Special feature: since the beginning very successful project, first of it´s kind with city of Stuttgart

Schwerter zu Solarscharen

Location: Bad Rappenau / Siegelsbach

120 one-axis Trackers with 417 kWp, commissioning 2008

Partner: Bundesrepublik Deutschland represented by BIMA und Bundesforst

Legal Society: ecovision Solarfonds GmbH&Co. KG Schwerter zu Solarscharen

Limited partners: 61

Special feature: our most spectacular and technically most ambitious project due to mechanical tracking

SWE Bürgersolarfonds I

Location: Emmendingen, 5 buildings of city

– 62 kWp, Meerweinschule, Dezember 2007

– 14 kWp, Dach der Feuerwehr, Februar 2008

– 61 kWp, Sporthalle des Goethe-Gymnasiums, Dezember 2008

– 42 kWp, Kindergarten „An der Wiese“, Mai 2009

– 40 kWp, Grundschule in Kollmarsreute, November 2009

Partner: city and utility of Emmendingen

Legal Society: SWE Bürgersolarfonds GmbH&Co KG

Limited partners: 59

Special feature: very successful cooperation with local utility, therefore more 4 projects followed

SWE Bürgersolarfonds II

Location: Emmendingen

Bauhof und Realschule, 2 buildings of city

– Bauhof, 44,7 kWp, commissioning 2010

– Altdorfhalle, 42,5kWp, commissioning 2011

Partner: city and utility of Emmendingen

Legal Society: SWE Bürgersolarfonds II GmbH&Co KG

Limited partners: 19

Special feature: the plant must always be adapted to the local conditions not vice versa

SWE Busbahnhof

Location: Emmendingen

Busbahnhof/Bahnhof, 62,1kWp, commissioning 2010

Partner: city and utility of Emmendingen

Legal Society: SWE Bürgersolarfonds GmbH&Co KG

Limited partners: 15

Special feature: located between high speed train and bus station, optically very nice

SWE Bürgersolarfonds III

Location: Emmendingen

Stadtwerke und Realschule, 2 buildings of city

– Stadtwerke-Gebäude, 54,3 kWp, commissioning 2011

– Altdorfhalle, 26,3 kWp, commissioning 2011

Partner: city and utility of  Emmendingen

Legal Society: SWE Bürgersolarfonds III GmbH&Co KG

Limited partners: 14

Special feature: with increasing confidence the limited partners: invest more in each new project

DfM – Solar Dreams

Location: Ebersbach / Fils

66,09 kWp auf Wohn- und Pflegestift, commissioning 2010

Partner: congregation

Legal Society: Solar Dreams GbR

Limited partners: 6

Special feature: due to the small size of the plant a non-trading partnership was chosen. More complex feed-in situation on 3 roofs

DfM Kennenburg

Location: Esslingen

Pflegestift, 66,2kWp, commissioning 2011

Partner: congregation

Legal Society: Solar dfm Kennenburg GbR

Limited partners: 3

Special feature: we want to fly at higher game – plant installed on 6th floor rooftop

Solarscharen II

Location: Bad Rappenau / Siegelsbach

13 former atomic bunkers and 3 buildings

504,9 kWp; commissioning 2012

Partner: Bundesrepublik Deutschland represented by BIMA und Bundesforst

Legal Society: ecovision Solarfonds GmbH&Co. KG Solarscharen II

Limited partners: 14

Special feature: former atomic bunkers converted into solar producers

Solarscharen Drei

Location: Bad Rappenau / Siegelsbach

Ground-based plant with 1167 kWp, commissioning 2011

Partner: Bundesrepublik Deutschland represented by BIMA und Bundesforst

Legal Society: ecovision Solarfonds GmbH&Co. KG Solarscharen Drei

Limited partners: 21

Special feature: classic design of the PV plant– outperforming target yields at this historical location

Solarscharen Vier/Sechs

Location: Bad Rappenau / Siegelsbach

Ground-based plant with 1167 kWp, commissioning 2011

Partner: Bundesrepublik Deutschland represented by BIMA und Bundesforst

Legal Society: ecovision Solarfonds GmbH&Co. KG Solarscharen Vier

Limited partners: 21

Special feature: one site – different special purpose vehicles (societies)

Oberfranken IV / SF 9

Location: Döhlau / Oberfranken

Ground-based plant with 2318 kWp, commissioning 2012

Partner: local private owners

Legal Society: Solarfonds 9 – Oberfranken IV GmbH&Co KG

Limited partners: 60, thereof 39 members of a cooperative

Special feature: innovative combination of cooperatives and limited partners plus 2 general partners

SWE Bürgerwind

Location: Weißmoos / Schweighausen

Windturbine, 3 000 kWp, commissioning 2013

Partner: local private owners

Legal Society: SWE Bürgerwind I GmbH&Co KG

Limited partners: utility Emmendingen + 20 limited partners + 400 members of 2 cooperatives

Special feature: our first wind (Repowering-) project; outperforming since the beginning

Agrardächer/ SF12

Location: Roofs of several farms on 3 locations

– Harzungen (Thüringen); 1011,8 kWp

– Pfaffendorf (Brandenburg); 1006,3 kWp

– Rothenburg (Sachsen), 1000,3 kWp

commissioning 2013

Partner: the farm owners

Legal Society: Solarfonds Agrardächer 12 GmbH & Co. KG

Limited partners: 20 limited partners + 27 members of a cooperative

Special feature: combining farming and solar PV electricity generation at the same location

Bürgerwind Lahr2 – Seelbach

Location: Seelbach / Langenhard-Kempfenbühl

Windturbine E1 38, 4 200 kWp, commissioning 2021

Partner: local private owner

Legal Society: Limited partners: 20, plus 113 members of a cooperative, 4 subordinated loans from cooperatives

Special feature: innovative combination of cooperatives and limited partners plus 2 general partners and four subordinated loans from cooperatives; fast realisation